Sign in Subscribe

Planning Board closes hearing on Hammerhead Lot project at 70 Walcott Street

Planning Board · Meeting of March 3, 2026

Stow Planning Board closes hearing on Hammerhead Lot project at 70 Walcott Street. Applicant's engineer, representing Goldsmith, Prest & Ringwall, Inc., presented revisions including a widened common driveway to accommodate emergency vehicle turning circles, re-labeled three- to four-bedroom homes (with septic systems designed for seven bedrooms), and stormwater basins engineered to contain a 50-year storm event of nearly seven inches of rain over 24 hours. The Board voted 5-0 to close the public hearing and separately agreed to revise the draft driveway covenant to explicitly address snow treatment.

The Board also completed a Comprehensive Plan work plan review, designating Housing Diversity Strategy and Plan, Naturally Occurring Affordable Housing, and Zoning Assessment for Fair Housing as high priorities while removing the Town Wide Traffic Plan from its agenda.

In the full story:

  • The complete report — 391 words

Source: the Planning Board meeting of March 3, 2026, reported from the official video recording and transcript.

Keep reading with a 14-day free trial

Subscribe to Stow News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Stow News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe